A clean install, start to finish.
Our licensed crew handles everything: the site survey, permits, pad, gas line, transfer switch and startup. You get a generator that's ready the first time the power fails.
Five steps to backup power.
- 1
Free site survey
We check your electrical panel, your fuel source, and the best spot for the unit, with clearances and noise in mind.
- 2
Your quote
A clear quote for the right Kohler model, fully installed.
- 3
Permits
We file the permits your town or county requires and schedule any inspections.
- 4
Install day
We set the pad, run the gas line, install the transfer switch and connect everything to your panel.
- 5
Startup and walkthrough
We test a simulated outage, set up the app, and show you how it all works.
What we take care of.
- The pad. A level base in the right spot, at the clearances the code requires.
- The fuel line. Natural gas or propane, sized for the generator and pressure-tested.
- The transfer switch. The part that senses an outage and moves your home onto generator power.
- The wiring. Done by our licensed electricians and connected to your panel.
- Cleanup. We leave the site the way we found it.

Before you book.
How long does install take?
It depends on the home and the permit office. You get a clear timeline with your quote, and we work installs into the schedule as quickly as we can.
Do I need natural gas?
No. Kohler home generators run on natural gas or propane. We'll recommend the best option at your site survey.
From the trailer to power on.
A few snapshots from recent jobs: delivery, setting the unit, and the finished install through Tennessee weather.






Be ready before the next storm.
Book a free site survey. We'll size the right Kohler generator for your home, handle the permits, and give you a clear quote.